Window installation determines a building's heat losses, acoustics, driving-rain tightness, and burglar resistance – not the window alone but its junction with the wall sets the quality. The trade covers new installation in new builds, replacement in existing buildings, entrance doors, lift-and-slide and folding systems, façade doors, and glazing work. The proper connection joint has three planes: airtight on the inside (vapour barrier), insulation in the middle (PU foam or mineral wool), and weather-tight yet vapour-open on the outside. Mechanical fixing uses screws or frame anchors at a defined spacing. Example Germany: state of the art is RAL installation per the RAL Quality Association for Windows and Entrance Doors, supplemented by DIN 4108-3 (driving-rain protection) and DIN 18055.